PROJECT
CLIENT
This project consisted of the conversion of commercial spaces into rental units. The building previously had a basilaire and our client converted these spaces into 53 units. We performed the central mechanical and central system upgrades to support the change. The chiller was replaced with a dry cooler to do aerothermal. The ventilation and domestic hot water systems were upgraded. In winter and mid-season, outdoor conditions permitting, the aerothermal system provides preheating for domestic hot water and heating for the ventilation and garage. In the summer, we are able to produce domestic hot water because of the need for air conditioning. The boilers are now used as redundancy for the chiller and to support the heating needs during cold periods.
Project in numbers
Energy and maintenance savings
108 000
$
Natural gas savings
240 000
m3
Subsidies
398 000
$
ROI
7,1
years
Our other projects
2500, boul. de l’Université, Sherbrooke
Chemistry pavilions D1 and D2 primarily house laboratories, offices and miscellaneous rooms. The goal of the project was to implement heat recovery in the exhaust of the laboratory fume hoods by replacing approximately 60 extractors with a new common network of only a few variable speed exhaust fans.
1000, route de Lotbinière, Vaudreuil-Dorion
Summerlea Golf Club made major renovations to its building in 2019. In addition to bringing it up to date, the owners wanted to make it as environmentally friendly as possible. They challenged us to redo the facility to reduce their propane consumption…
2551, chemin des Quatre-Bourgeois, Québec
The Quartier QB neighborhood complex was built in 2017. After a winter of operation, managers immediately noticed that energy bills were far too high. Although it was new construction, we agreed to modify the systems to reduce their consumption…
© 2022, KROME, ALL RIGHTS RESERVED